Permit Fees


Side Sewer & Development Fees (effective March 9, 2023)

Residential Fee  
Single family residence side sewer permit $550.00 Single family dwelling (may also include detached-condominium, ADU, etc.)
Multi-family side sewer permit $300.00 per unit Each dwelling unit for duplex, triplex, apartment, condominium, mobile home park, etc.
Accessory Dwelling Unit (ADU) connection permit $300.00 Unit meeting the District's criteria of an ADU and sharing a side sewer with the parcel's primary residence
Accessory Structure connection permit $250.00 Structure meeting the District's criteria of an Accessory Structure sharing a side sewer with the parcel's primary residence
Modification of side sewer permit or sewer stub extension permit $250.00 Existing side sewer or sewer stub modification
Side sewer repair permit $100.00 Repair of existing side sewer with current service
Capping permit or uncapping permit $300.00 Disconnection or reconnection of existing sewer service


Commercial Fee  
Commercial side sewer permit $550.00 per ERU Commercial ERU calculations determined using the District's Commercial General Facilities Charge methodology
Mixed use commercial and residential side sewer permit $550.00 per Commercial ERU + 
$300.00 per Residential unit
Commercial ERU calculations determined using the District's Commercial General Facilities Charge methodology
Pretreatment device permit $250.00 Installation, modification or removal of a grease trap, grease interceptor, oil/water separator and/or other device required by the District's Pretreatment Regulations
Commercial side sewer repair permit $250.00 Repair of existing commercial sewer connection
Commercial capping permit or uncapping permit $300.00 Disconnection or reconnection of existing sewer service


Additional Services Fee  
Sewer main tapping fee $250.00 each a new or modified connection requiring the taping of the District's sewer main
After hours / weekend inspections $350.00 minimum charge + $125.00 per each hour over 2-hours All after hours / weekend inspections shall be scheduled 48-hours in advance. The District reserves the right to deny any after hours / weekend inspections for any reason. Any time over 2-hours will be billed in 0.5-hour increments.
District observed holiday inspections $750.00 minimum charge + $325.00 per each hour over 2-hours All holiday inspections shall be scheduled 5 business days in advance. The District reserves the right to deny any holiday inspections for any reason. Any time over 2-hours will be billed in 0.5-hour increments.
Reinspection $100.00 Failed inspections or if inspector arrives on-site and the site is not ready for the inspection
Sewer Permit Extension $50.00 A 90-day extension of the expiration date of a sewer permit, must be paid within 30-days of the issued permit expiring

General facility charge (gfc, aka connection fee) (effective June 1, 2022)

$13,500.00 per ERU - additional fees may apply, please contact the District for a specific quote